Connecting and configuring UPS
The company “AVR PLUS” implements on new and integrates into existing facilities solutions for parallel, cascade, serial connection of UPS in Kiev and Ukraine for data centers and server rooms; offices, shopping centers and hotels; banks and financial institutions; medical institutions; telecommunications facilities; industrial and energy facilities.
Our principles for solving the assigned tasks
- Flexibility and speed in decisions
- Energy efficiency
- Environmental Safety
Connecting and configuring UPS Kiev, Ukraine
Modern and reliable power supply and automation solutions
for offices and business centers
for cafes, restaurants, hotels
for a private house and apartments
for shops and shopping and entertainment centers
for banks and financial institutions
for manufacturing enterprises
for educational centers and institutions
for medical centers
Connecting a UPS in Kiev
Uninterruptible power supplies (UPS) provide uninterrupted power supply to critical pantographs in the event of a centralized power failure. The AVR Plus company performs installation and connection of UPS at industrial and domestic facilities – we work quickly, conscientiously and at affordable prices!
Basic requirements for a UPS installation room
In order to create adequate operating conditions for the equipment, the UPS must be connected in a climate-controlled environment. Before installing the UPS, make sure that the ventilation and air conditioning systems are working properly; the microclimate of the room must meet the regulatory requirements:
- humidity level – up to 95%; roof leakage and condensation are not allowed;
- low dust level;
- flooring – made of antistatic materials or treated with an antistatic agent.
Selecting a location for installing the UPS
The choice of a UPS connection location requires the organization of free access to equipment for unhindered maintenance and repair. When installing an uninterruptible power supply, space may also be required for auxiliary equipment – for example, connecting a UPS to a generator requires a stabilizer to compensate for frequency fluctuations. If the operating voltage of the uninterruptible power supply is higher than the nominal voltage of the outlet, the UPS is connected to the switchboard with a separate line and automatic switches installed.
Commissioning for UPS
The next stage after installation and connection is commissioning, during which the key parameters of the uninterruptible power supply system are tested:
- correspondence of the output current to the ratings of tires and automata;
- network cable section;
- supply current to the input;
- checking battery voltage;
- Proper installation and adjustment of the UPS.
If the connection and configuration of the UPS is completed without errors, an acceptance certificate is issued, giving the right to warranty service. The act fixes the compliance of the installed system with the project documentation and the briefing on the operation and maintenance of the equipment.
UPS Parallel Connection
Single-phase uninterruptible power supplies with double conversion are connected in parallel in highly reliable networks of various capacities. To evenly load the UPS and prevent parasitic currents, the output currents are synchronized in frequency, initial phase and amplitude by organizing communication between uninterruptible units via a signal cable.
Parallel connection of two UPSs
In parallel, it is convenient to connect two uninterruptible power supplies with different nominal DC voltage; the greater the power of the UPS, the higher the voltage.
UPS serial connection
When you connect the UPS in series, the power increases many times, but the risk of overloading one of the devices increases, so you should not connect more than two uninterruptibles. To prevent power surges, special attention is paid to grounding the power wires of the UPS, each of them is connected directly to the outlet.
Cascading UPS
The cascading of several batteries extends the battery life of the system, but due to the high probability of interference, this method is rarely practiced. For cascade connection, batteries with additional output connectors are used, the level of current distortion is regulated by filters at the rectifier input.
Certificates and Licenses
Schneider Electric Panel Builder Certificate
List of types of construction works
License of the State Architectural and Construction Inspection of Ukraine
Work permit
Own production
Our own high-tech production, cooperation with manufacturers of reliable and modern components, as well as extensive experience in projects of various levels of complexity allows us to implement the ideas of our clients at reasonable prices.
We use only reliable components
We use only reliable components from well-known world manufacturers
Prices for electrical services
01
Prices for electrical services depend on the scope of the project, conditions and features of the installation of structures at the facility.
02
The price for electrical services is much lower if you order design, production and installation from our company.
03
The exact cost of electrical services is announced when calculating the estimate of the task.
Our completed works
Feedback from our clients
The whole range of turnkey works in one campaign!
Design
Manufacturing
Delivery
Mounting
Service
